Building Horseworld

  • The front entrance in construction and complete

  • The western side of the Stadium showing part of the maze of earthworks needed to handle the flow of water from the 3 acres of stadium roofing to the dams.

  • The front entrance looking west

  • The seating support structure (these seats won’t fall down!)

  • Underground water tanks
    The excavated site and the 2 concrete tanks poored in situ

  • Western side under construction

  • The site of the stage, the Midway Canteen, the Bull Bar and the event offices.

  • The walkways going front to back on the eastern and western sides. Note the size of the steel beams that span the whole stadium.

  • The warm up and intimate clinic arena.

  • The main area – a massive clear span